I'm pouring a reinforced concrete slab pathway to my front door which i want to tile with victorian mosaic tiles. the path will be 10m x 1m. i've been told to cut expansion/control joints every 2.5 metres. if i do that, do i fill these joints with screed and tile over them?
any advice
any advice