wall running out

C

crazysteve123

Hi, am in the process of tiling a bathroom i set out the first wall made sure the first row was level but as i started to tile up towards the ceiling the gap between the tile and the other wall started at 5mm at the bottom but was a good 10mm at the top i managed to cover it up when i tiled the other wall but i would like to know how i could avoid this again in the furture thanks...
 
When you centre your wall etc etc...take your vertical centre line from floor to ceiling and then measure across from the line to the opposite wall/s and see what the difference is..this will tell you what is out and where........and try to avoid working full tiles to corners if the wall runs out.....:thumbsup:
 

Advertisement

Which tile adhesive brand did you use most this year?

  • Palace

    Votes: 9 5.2%
  • Kerakoll

    Votes: 17 9.9%
  • Ardex

    Votes: 12 7.0%
  • Mapei

    Votes: 49 28.5%
  • Ultra Tile

    Votes: 21 12.2%
  • BAL

    Votes: 40 23.3%
  • Wedi

    Votes: 4 2.3%
  • Benfer

    Votes: 5 2.9%
  • Tilemaster

    Votes: 24 14.0%
  • Weber

    Votes: 19 11.0%
  • Other (any other brand not listed)

    Votes: 17 9.9%
  • Nicobond

    Votes: 8 4.7%
  • Norcros

    Votes: 2 1.2%
  • Kelmore

    Votes: 5 2.9%
Back
Top