C
crazysteve123
Hi, am in the process of tiling a bathroom i set out the first wall made sure the first row was level but as i started to tile up towards the ceiling the gap between the tile and the other wall started at 5mm at the bottom but was a good 10mm at the top i managed to cover it up when i tiled the other wall but i would like to know how i could avoid this again in the furture thanks...