Hi guys, I've just installed Weberfloor flex in a small area 1m2 @35-40mm depth in one pour. The data/spec states 24hr dry time @5mm only, and " can be built up to 50mm " drying times vary, conditions etc. So not quite clear on expected dry time at the depth I've installed it at.
Could anyone offer their advice please ? Floor finishing going down, this area was an afterthought, so needing to plan ahead - have written their tech support but thought to ask here.
Also, was left with approx 5-7mm for top coat level screed as advised in CTD (the Cemfloor Screed level is off either side) best options to level ? It's Engineered Oak boards going on top (can trim and they are glue down, so scope there/glue). Cheers, Alan
Could anyone offer their advice please ? Floor finishing going down, this area was an afterthought, so needing to plan ahead - have written their tech support but thought to ask here.
Also, was left with approx 5-7mm for top coat level screed as advised in CTD (the Cemfloor Screed level is off either side) best options to level ? It's Engineered Oak boards going on top (can trim and they are glue down, so scope there/glue). Cheers, Alan