Hi.
This is how i was planning it, any thoughts or suggestions please say.
Marmox showerlay - floor up and strengthened, 18mm ply back instead of chipboard, tray stuck.
12.5 mm Marmox boards on stud walls, screws and washers.
Dural WP on rendered wall and stud walls, using preformed corners etc.
Got some Bal WP1 from another job, was going to put some around the waste on tray as well, not overly impressed with the wate through the board.
Rest of floor replaced with 18mm WBP ply, 10 marmox, warm-up, SLC, Ditra, Trav.
Am I right in thinking I could put some screws around the edge of tray as well as sticking ?
Thanks for any replies
steve
This is how i was planning it, any thoughts or suggestions please say.
Marmox showerlay - floor up and strengthened, 18mm ply back instead of chipboard, tray stuck.
12.5 mm Marmox boards on stud walls, screws and washers.
Dural WP on rendered wall and stud walls, using preformed corners etc.
Got some Bal WP1 from another job, was going to put some around the waste on tray as well, not overly impressed with the wate through the board.
Rest of floor replaced with 18mm WBP ply, 10 marmox, warm-up, SLC, Ditra, Trav.
Am I right in thinking I could put some screws around the edge of tray as well as sticking ?
Thanks for any replies
steve