W
willbones
I've taken a joint venture this week, bathroom re-model. I need to remove an old cast iron bath, fit a new bath. Remove an old radiator, re-route pipework to the other side of the bathroom, and fit chrome towel rail. Tile about 10m2 in 15cmx15cm travertine and then fit wood flooring. There are two of us on the job and will get it done in 3 days. How much would you be looking to charge?