A
alib103
Never normally have problems with doing quotes but i'm a bit stuck on the one i'm off to do tonight. Its to take tiles off a shower cubicle (3 walls) fix new backer board, tile and fit shower door. I reckon if things go smoothly it'll be a days work so i would charge a days rate. Within that i normally include adhesive and grout.
I'm going to add on the cost of the backerboard but because he wants it fitted, tiles taken off and the doors fitted i was going to charge extra for all that, but not exacly how sure how much to charge!
Reckon including all materials it will be a little over a day and a halfs rate.
Just checking you guys would do the same?
I'm going to add on the cost of the backerboard but because he wants it fitted, tiles taken off and the doors fitted i was going to charge extra for all that, but not exacly how sure how much to charge!
Reckon including all materials it will be a little over a day and a halfs rate.
Just checking you guys would do the same?