W
Wills
Hi all
Just about to tile my bathroom shower area approx 4.5 sqm, had the walls plastered monday 5 days ago they've now dried. one wall is also 12mm ply on battons that i had previously coated with pva.
ive purchased 250 x 330 wall tiles from b and q along with a 10kg tube of bal white star tile adhesive What my question is will this adhesive suit my conditions and also should i wait the 4 weeks stated for new plaster also would i need to prepair the area with anything before hand.:hurray:
Just about to tile my bathroom shower area approx 4.5 sqm, had the walls plastered monday 5 days ago they've now dried. one wall is also 12mm ply on battons that i had previously coated with pva.
ive purchased 250 x 330 wall tiles from b and q along with a 10kg tube of bal white star tile adhesive What my question is will this adhesive suit my conditions and also should i wait the 4 weeks stated for new plaster also would i need to prepair the area with anything before hand.:hurray:
Last edited by a moderator: