job I've just finished, customer was away on holidays and left us to it, this is what I found on the rip out..most tiles dot and dabbed onto bonding...glass mosaics packed out on 4mm ply, floor tiles layed onto 6mm ply..
total strip out back to the brickwork as the bonding was about 40mm thick and applied onto already perishing mortar render. Dot and dabbed all wall areas with 12.5mm plasterboard and overboarded floor with hardie 250, really can't believe that existing tiles weren't dropping off.
2015-06-24 09.07.00.jpg
2015-06-24 09.07.06.jpg
2015-06-24 09.07.11.jpg
2015-06-24 09.08.31.jpg
2015-06-24 09.20.13.jpg
2015-06-24 10.27.08.jpg
 
I like the challenging jobs. But only when I finish them! Facing a room like that makes your heart sink when you think "the prep should be sorted by lunchtime on day 1....." and then realise it may take 3 days before you even start tiling.
not far wrong Andy, took 4 days prepping, but to be fair to customer I did say that I couldn't price it realistically as I'd no idea up front what prep would be involved. I put my invoice in this morning and got paid this afternoon.
 
They seem to be coming more common I'm finding. 2 recent bathrooms I've done I've had to replace majority of walls and both floors as they were rotten around bath and shower areas, and both of these were only done within the last couple of years.
 

Advertisement

Thread Information

Title
What's behind the tiles?
Prefix
N/A
Forum
Australia Tiling Forum
Start date
Last reply date
Replies
6

Thread Tags

Advertisement

UK Tiling Forum

Thread statistics

Created
Dougs Third Go,
Last reply from
Simons70,
Replies
6
Views
1,148

Thread statistics

Created
Dougs Third Go,
Last reply from
Simons70,
Replies
6
Views
1,148
Back