Well almost done, had to remove black tar paper, gunk, that was under 3 layers of vinyl, then maybe vinyl
tile, then maybe gold sparkled linoleum. Have 1 spot left. Have to sand floor and replace maybe 5 or 6 of the t&g sub floor. This week hopefully putting down plywood. Square patch job has to come out and done better. I am sanding walls as I go slowly. Any one know if I can
tile right on the drywall??
Have more than a few places that need drywall put in, they had none around the bottom where the old shower was located. I made a hole pushing shower over to get behind to get to floor.
Also when I redo the plumbing, why they didn't put it up thru the wall, idk. The plumbing is taking up around 7 inches of space. The shower should have been flush with back wall.
The bathroom is only 6ft 3 in by 10 ft. I will probably crack
tile moving it maybe
Toilet being replace with in wall about where it is now and a small vanity next to it. Big shower against back wall. Mural on wall behind shower and up both sides to edges of shower unit. Wall tiles only from edges of shower to door, halfway up.