L
LJD
Did the floor today with Rapid mapei . Found it was going off too quickly .Tiles cut and laid Dry etc first to make sure all good. Just found the mapei Rapid had gone off in the bucket within 15 mins . When it comes to doing the walls I would like a longer "pot life" so i can at least do 10 tiles etc before it all goes to dry
cheers
cheers