follow_along_with_video_below_to_see_how_to_install_our_site_as_web_app
Note: this_feature_currently_may_not_be_available_in_some_browsers
Discuss Work , work , work and more work. in the Australia Tiling Forum area at TilersForums.com.
multi traders generally equates to handymen. sometimes pretty good. do but im my experience they are usually pretty poor
joiner being a plumber/tiler and calling themselves a bathroom specialist,
I'am just a tiler Dave!
When I spend 2 hours washing emulsion off a wall and I look out the small wet room window at the rain chucking it down, it says something when I wish I was outside!
I have'nt worked for builders for a long time and have started to see why, I'm doing an en-suite, there's a window opening about 1.7m from the floor level measuring .700x.300mm and there's sterling board on the outside which has eml screwed on it and been rendered externally and the window waiting to be fitted.
chuck on some PVA. And that'll last yrs lol lol.
Yer sod the expense or just tile over the window opening:lol:
Reply to Work , work , work and more work. in the Australia Tiling Forum area at TilersForums.com