Newbuild shower tiling nightmares!

Tilers Forums Official Sponsors

N

neologic2k

Hi All,

I recently moved into a new build (5 years old) we had a problem with a shower and had a chap round to tank and re tile, on closer inspection the main bathroom has also leaked. I've taken off the tiles and removed all of the blown plasterboard, this has now been replaced with new.

I was thinking about tanking it myself, but then noticed after watching a few videos that the plasterboard is supposed to be behind the shower tray. The builders (B&£@! Homes) have installed the plasterboard in front of the tray, am I right in thinking no matter what I do, I cant tank\seal it without ripping down the other walls and installing the shower tray correctly?

I've added a few pictures of before and what I've done now with plasterboard.

What I'd really like is advice or options please?

Thanks in advance.

IMG_6793.JPG IMG_6813.JPG IMG_6814.JPG IMG_6793.JPG IMG_6794.JPG IMG_6795.JPG IMG_6796.JPG IMG_6798.JPG IMG_6799.JPG IMG_6800.JPG IMG_6801.JPG IMG_6802.JPG IMG_6803.JPG IMG_6805.JPG IMG_6808.JPG IMG_6810.JPG
 
That's an upstand tray, so the plasterboard should line up with the inside edge. Looking at your pics, it does.
Personally, I would have removed all the board and replaced with waterproof insulation boards. But you will be ok tanking what you have there.
Use Ardex WP to tank. Firstly, mix a small amount and fill the gap between the board and tray ( mask off the tray first)
Once that has set, use the fibreglass tape in the corners and over the plasterboard to shower tray junction. Also tape over joins in the boarding. Then tank the lot and tile
 
From the original work shown the main reason for the failure is the small cut of tiles at the shower tray. This is a disaster waiting to happen and you must bridge the gap to a sufficient height to make the bottom cut watertight and secure.
The wall plaster needs to be primed and a water resistant adhesive and grout used.
Make sure this tray is solidly fixed/supported as even the smallest movement will result in the same issue.IMG_1497.PNG
 
Thanks Guys,

So seems that building up the tanking material from the tray and tile over the top is the way forward 🙂)

Will post back with results
 
I would have siliconed between tray and bottom of plasterboard, then the next day then once set,

tank over the lot. Advice late but might help someone else !
 
Thanks Guys,

So attached are the pictures, replaced plasterboard, tanked the whole area, tiled, grouted, fitted door and silconed!

First attempt at this I know there are some tiles out! 🙂

Really appreciate the advice and support!

IMG_6813.JPG IMG_6852.JPG IMG_6828.JPG IMG_6845.JPG IMG_6815.JPG IMG_6816.JPG IMG_6822.JPG IMG_6826.JPG IMG_6875.JPG IMG_6876.JPG IMG_6856.JPG
 
Not level clips Andy, just different spacers, handy for metres as you can use them more like removable pegs, just have to make sure the addy isn't in the joint when you put them in, as they are a nightmare to remove when set
 

Advertisement

Thread Information

Title
Newbuild shower tiling nightmares!
Prefix
N/A
Forum
Tanking and Wetrooms
Start date
Last reply date
Replies
22

Advertisement

UK Tiling Forum

Thread statistics

Created
neologic2k,
Last reply from
Cstiling,
Replies
22
Views
15,672

Thread statistics

Created
neologic2k,
Last reply from
Cstiling,
Replies
22
Views
15,672

Weekly Email Digest

Back