- 0
- 196
Please see my earlier thread for background information to this problem.
http://www.tilersforums.com/stone-tiling-forum/40827-travertine-tiles-shower-help-needed.html
The tiler/plumber started on Tuesday this week. He brought with him a younger guy to assist. They took out the bath, washbasin, loo and shower tray and boarded and then tiled the floor. The tiles had all been sealed first. So far, so good I thought.
Yesterday they put the bath back in and then started tiling around the bath. All seemed to be going well as far as I could see. Today, the main man went out 'to get some grout' and was gone for over three hours. During that time his assistant (a carpenter) carried on tiling. I went upstairs to see how he was getting on and was horrified to see that he had started at one corner of the wall and has worked across the wall, but when he gets to the other corner there is a gap which he tells me he will fill with grout. He has used very few spacers, working mainly by eye, so the grouting gaps are not consistent, some are big, some are small. My picture will explain better than me.
When the main man gets back he tells me not to worry, he will cut some slithers of tile to put in the gaps, which he has done, but to me the whole thing has been spoiled. There is a full tile at one end of the wall and a slither of tile at the other, and it's the wall facing you as you come into the bathroom. I could have wept. I really wanted a great job and, to me, it looks amateurish. Picture enclosed.
On another wall the bath is centred and the taps are centred too, but the tiling is not centred on the taps so the tiling looks unbalanced. Please tell me, will it look better when it's grouted, which is what the tiler tells me? Am I being too particular?
I really wanted to feel that this was fabulous, it's costing a fortune, but I feel physically sick about what to do or think.
http://www.tilersforums.com/stone-tiling-forum/40827-travertine-tiles-shower-help-needed.html
The tiler/plumber started on Tuesday this week. He brought with him a younger guy to assist. They took out the bath, washbasin, loo and shower tray and boarded and then tiled the floor. The tiles had all been sealed first. So far, so good I thought.
Yesterday they put the bath back in and then started tiling around the bath. All seemed to be going well as far as I could see. Today, the main man went out 'to get some grout' and was gone for over three hours. During that time his assistant (a carpenter) carried on tiling. I went upstairs to see how he was getting on and was horrified to see that he had started at one corner of the wall and has worked across the wall, but when he gets to the other corner there is a gap which he tells me he will fill with grout. He has used very few spacers, working mainly by eye, so the grouting gaps are not consistent, some are big, some are small. My picture will explain better than me.
When the main man gets back he tells me not to worry, he will cut some slithers of tile to put in the gaps, which he has done, but to me the whole thing has been spoiled. There is a full tile at one end of the wall and a slither of tile at the other, and it's the wall facing you as you come into the bathroom. I could have wept. I really wanted a great job and, to me, it looks amateurish. Picture enclosed.
On another wall the bath is centred and the taps are centred too, but the tiling is not centred on the taps so the tiling looks unbalanced. Please tell me, will it look better when it's grouted, which is what the tiler tells me? Am I being too particular?
I really wanted to feel that this was fabulous, it's costing a fortune, but I feel physically sick about what to do or think.