Hi all. In line with my other thread asking for some opinions on tiling layouts for my bathroom reno redo, here are some pictures showing why I’m not happy with the current install. Let me know if I’m just being fussy.
I supplied the tile, which was approved by the tiler (who was also the...
Andy Smith
Thread
happy
job
jobs
this
tiling job
tilingjobstiling work
work
would
Have a bathroom installation in process. Has become clear that the company is not good at tiling. First of all, they tiled at different levels on opposite walls, so when the adjoining wall was tiled, the tiles didn't line up.
They re-did it, but have left a gap between the ceiling and tiles of...
My wife and I recently had a new kitchen and bathroom fitted and we’re not best pleased with the finish. Are we wrong to be unhappy about this tiling job? We’d appreciate some feedback from the experts please.
Thank you
Monkey100
Thread
bad
bad tiling
canada
job
jobs
this
tilingtiling job
tilingjobstiling work
work
We have our regular scheme in Broxtowe that needs a tiler on.
The work is regular, (and has been for the last 7 years!), although not always 5 days a week...
Kitchens, Bathrooms, Voids.....all tiles kept in our container down the road.
If you are happy just doing this work we let you know...
1st- when doing a kitchen splashback, when finishing off do you have to Silicon around the bottom where the tiles sit on the worktop??
2nd- are there any methods when using adhesive to mix in the wall sealant with it so you dont have to wait for the walls to dry before tiling ?
thanks ..
James aldridge
Thread
bathroom
have
job
jobs
kitchen
questions
silicone
tilingjobstiling work
work
worktop
Hi guys,
I'm currently on my first job after finishing the 9 day course with UK Pro Tiling Training, which I must add was absolutely brilliant!!!
So after removing the 7m2 area of mosaic tiles the plaster behind the tiles just crumbled off the wall due to previous leaks.
2 -...
James De
Thread
course
first
job
jobstilingtiling job
tilingjobstiling work
work
hello all,
I have posted on this site before but not for a while ( I promise to try harder!). This a great forum and is of great support to me.
I have been tiling for approx 15 years. Not full time but more part time as part of my other roles within the property business. I have learnt all I...
Evening chaps. DIY disaster here. Renovating my bathroom.
Going to be laying a LOT of tiles (nice wee metro tiles). Thought I'd join and what not so I can thank people for advice and ask questions.
Koomber
Thread
bathroom
diy
do it yourself
floor
job
jobs
kitchen
tiling job
tilingjobstiling work
walls and floor
work
I have a contract for 4 properties each requiring ground floor tiling, kitchen splashbacks, bathroom floors(over UFH) full shower areas and half room walls. Urgently needed in cheshire. Ideally a group of 4 to hit the site running. Further work available around cheshire/merseyside/wirral for...
slythetiler
Thread
find a tiler
job
jobs
needed
new build
new builds
tiler
tilers
tilers directory
tilingjobstiling work
work
Hi all,
I've just had 4m2 of white bevelled metro tiles done in my kitchen by a guy who according to reviews is always really neat, tidy etc.
After a day and a half of work, he has finished and left. Looking from afar, it looks OK but looking up close it is anything but neat and tidy and has...
Al875319
Thread
advice
finished
job
jobs
needed
please
tiling job
tilingjobstiling work
today
work
Hi , I’m just about to finish my level 2 tiling , I’m 17, turning 18 in January and am now looking to gain some experience in this industry, I’m finding it very hard to find labouring work with no experience, does anyone know any companies around Manchester that may take inexperienced tilers on. TIA
Hi there
Currently doing the final prep for a wet room, should be ready in approx 6 weeks.
Wall sizes are as follows
2.2m wide x 2.2m high - 4.8sqm
2.2m wide x 2.2m high with a window 1.2 x 1.2m - 3.4sqm
1.8m wide x 2.2m high - 4 sqm
Walls to be done in metro tiles 10x20cm, window reveal to be...
We recently had a bathroom fitting in who said he used dot and dab to fix tiles to the wall and in the shower areas and also stated that any gaps behind tiles e.g. Mosaics would get filled in by grout so it would be fine. We can however hear what we think are some voids behind the large format...
We are a team of 10 tilers/stone fitters and 3 floor layers looking to expand our work load. We are based in Heathrow area and willing to travel if needed.
Full battery tools, wet cutters, CSCS and PPE + transport. A valid SMSTS and First Aid certificates in place that allows us manage our...
Getting a bathroom regrouted, bit concerned tiler has only taken the top layer of old grout out. Thought at least 3mm of tile sides needed exposing for the new grout to adhere? Please let me know your opinions.