Hi all
Doing a new build with Wet rooms ,the main body of the house will be liquid screed of 60mm on 40 mm insulation (doing wednesday), i was going to stop at the bathroom doors and then change to normal screed ,with these levels the plumber has set the purus minimax drain at 85mm and 90mm...