biffo17
hi my 1st post , im doing a 100%refit on my bathroom
all plaster is off ,all lath and plaster is off,its all being re tiled ok
a shower bath is going in ,this is where the bare brickwork is ,250 hardiebacker is going direct to wall /adhesive and screwed
the remaining walls all studwork i intend to use the 12mm moisture resistant plasterboards
the floorboards are up ,18mm ply going down 250 hardiebacker on top of this ,ahdesive and screwed
does this sound ok ??
im not doing the tiling !!!
horses for courses ,me thinks