I had to move the toilet waste pipe over and am now left with a 30mm thick gap (see photos, just over 2 plasterboards thick).
The whole area is gona be tiled with 200x100mm ceramic metro tiles so not much weight really.
I dont want to bond it as it will take over 4 weeks to dry. I had a shallow chase filled in on the same (solid external wall) wall 4 weeks ago and its still not dry.
What would u do to fill the area so its ready for tiling?
Cheers all.

The whole area is gona be tiled with 200x100mm ceramic metro tiles so not much weight really.
I dont want to bond it as it will take over 4 weeks to dry. I had a shallow chase filled in on the same (solid external wall) wall 4 weeks ago and its still not dry.
What would u do to fill the area so its ready for tiling?
Cheers all.