The panel is a door from b n q then I have cement boarded it then tiled it with edging.
The tiles are not from homebase, they are from our local tiling/bathroom place.
The plug socket is only 3 amp and it's going inside a cupboard for the under cabinet lights, my electrical man said it's classed as another room as its in cupboard and the planning guy has signed it off ok.
I have 1 box of each tile spare.
I covered the gap already in another post, going to be grouted then masked and painted to match ceiling so it blends and vanishes.