P
Paul
Hi Guys
Just after a bit of advice please if anyone can help we are about to put in a new shower loo and wash basin in our ensuite as its seen better days and is a bit dated we plan to have a power shower installed with the above i wont be doing the work on that but i plan to strip the ply and the old tiles back to the studs and plasterboard it, tank the wet areas then tile straight onto the new boards
There is a slight problem with the shower as its so small and there isnt enough room to shower really -tend you whack your right elbow when showering , to combat this i want the plumber to move the shower to the left a bit for some more space
im just wondering about the correct procedure of doing this work would i estimate the area i want the shower in as i need to cut the board for the shower fixings ? then tile the room then get the plumber in to do his work would this be in the right order ?
Thanks in advance
Paul
Just after a bit of advice please if anyone can help we are about to put in a new shower loo and wash basin in our ensuite as its seen better days and is a bit dated we plan to have a power shower installed with the above i wont be doing the work on that but i plan to strip the ply and the old tiles back to the studs and plasterboard it, tank the wet areas then tile straight onto the new boards
There is a slight problem with the shower as its so small and there isnt enough room to shower really -tend you whack your right elbow when showering , to combat this i want the plumber to move the shower to the left a bit for some more space
im just wondering about the correct procedure of doing this work would i estimate the area i want the shower in as i need to cut the board for the shower fixings ? then tile the room then get the plumber in to do his work would this be in the right order ?
Thanks in advance
Paul