M
MartinB
Hi I hope someone can point me in the right direction.
I am in the process of installing a new shower to replace my bath.
The long wall the shower tray butts up to is plaster over blockwork. The short wall is half plastered blockwork and half stud.
I have bought aquapanel to put up over the new studwork but was wondering how to butt it up to the existing piller of blockwork.
Can I just butt it up and apply aquapanel waterproof tape or would I be better putting aquapanel up for the whole length of that side?
PS I am not planning to aquapanel over the blockwork on the complete blockwork side.
I am in the process of installing a new shower to replace my bath.
The long wall the shower tray butts up to is plaster over blockwork. The short wall is half plastered blockwork and half stud.
I have bought aquapanel to put up over the new studwork but was wondering how to butt it up to the existing piller of blockwork.
Can I just butt it up and apply aquapanel waterproof tape or would I be better putting aquapanel up for the whole length of that side?
PS I am not planning to aquapanel over the blockwork on the complete blockwork side.