Before I left my work this evening I tiled the utility area , and closed the entry with a 15 mm sheet of plywood nailed to the frame, left the extension lead plugged in, and hung it on the frame , incase anyone needed power! Started the floor at 3 and finished it a half 5 ! The client rings me to tell me that the electrician has walked all over the floor and Is cutting cable , and moving conjut will this do the floor any harm! Ahhhh I thought the door being blocked of would have been enough to get him thinking, but then again these guys don't think about other people! 4 years of training and no manners or consideration ! :mad2::mad2: