T
The Legend; Phil Hobson RIP
Just been reading a thread about bad methods, didn't want to hijack it so I thought I would post a new one. Any of you guys & gals come across this one, a mate of mine who shall remain nameless. Having moved into a new area couldn't understand why he never won a floor tile job, he was pricing for prepping timber floors using either 18mm exterior ply or backer board.
He found out later that every tiler in his new area had the same method for over-laying T&G / chipboard etc. this entails fixing plaster board using flex adhesive bedded onto T&G etc. and clout head nails, then using same addy to fix tiles?????? He tells me he had to adopt this method to compete. He also says he has never had a failure ??????:yikes::ban:
He found out later that every tiler in his new area had the same method for over-laying T&G / chipboard etc. this entails fixing plaster board using flex adhesive bedded onto T&G etc. and clout head nails, then using same addy to fix tiles?????? He tells me he had to adopt this method to compete. He also says he has never had a failure ??????:yikes::ban: