Much appreciated if anybody could confirm the best sequence with a bath/panel on a job coming up.
I've to put thermal boards down,matting then self level.
It may be the Wedi bath panel system or frame and hardiebacker.
Is it best to have the frame or panel system firmly in place then thermal boards,matting and self level up to it or i can't see it been the case the bath goes in after the thermal/matting,slc and then sits on top of the new surface?
Cheers
Kev
Much appreciated if anybody could confirm the best sequence with a bath/panel on a job coming up.
I've to put thermal boards down,matting then self level.
It may be the Wedi bath panel system or frame and hardiebacker.
Is it best to have the frame or panel system firmly in place then thermal boards,matting and self level up to it or i can't see it been the case the bath goes in after the thermal/matting,slc and then sits on top of the new surface?
Cheers
Kev