S
Spare Tool
Oh ok so that's only reason then?if it's not dry when you start to tile and you need to lift a tile you put the mat up as well 🙁
Oh ok so that's only reason then?if it's not dry when you start to tile and you need to lift a tile you put the mat up as well 🙁
it is for me 🙂Oh ok so that's only reason then?
I've sent the builder the info for hardi floor for future jobs, I've past him all the relevant information as I've bin in contact with schluter and it will be goin in writing on my invoice that this method don't meet the guidelines set by schluter but I'm confident there won't be any problems he's a good builder with 3 decades behind him
All sorted then 😉The builder said he's a religious man and he's had a word with the big man up top and he said its gonna be just fine lol
been to a schluter demo this afternoon at local CTD and asked a few questions🙂 think they were getting p*** *** with all the questions 😉 anyway stick Ditra to any substrate with a C2 rated adhesive and no need to be rapid onto any surface and doesn't need to be set before tiling starts.Why do you have to use rapid only on ply, or wait for adhesive to dry before tiling?
Mate you've taken what I said TM had said way out of context..been to a schluter demo this afternoon at local CTD and asked a few questions🙂 think they were getting p*** *** with all the questions 😉 anyway stick Ditra to any substrate with a C2 rated adhesive and no need to be rapid onto any surface and doesn't need to be set before tiling starts.
when I asked why TM say use ultimate S2 they laughed and said so they make more money, it words to that effect, all thats needed is it to C2 rated as a minimum.
sorry for miss understanding, but same answer, Ditra onto green screed only needs a basic C2 adhesive.Mate you've taken what I said TM had said way out of context..
They only said Ultimate S2 perfect for sticking ditra/dural to a new/green screed, which was the question I asked. I'd already bought the gear anyway but was just double checking with them 🙂