I took today off thankfully, well I really needed more handson this job.
But while in lifting a cheque a got 40 linear metres of 100 x 20mm rojo marble borders for around the perimeter, I'll start them at 8am Monday.
Beautiful red coloured but easily broke.
The sigma 10m will be busy this week, only 8 slabs left to go down.