Guys
It's been a while!
Was hoping to get the whole bathroom finished before I posted pics, however, thanks to your previous good advice, please see the previous pics showing works complete to the niches. I'm really happy with them.The lighting in the niches is led strips in a 'tray' that runs along the top in a recess, the driver (which as previously pointed out is pretty much a consumable) has been fitted in the ceiling so if it ever fails can easily be replaced.
Anyway...reason it's not finished is that after this was completed a few months ago I started on other things (restoring a car that's also taking much longer than expected!) and re-decorating the house.
So now I want to get the bathroom complete, and would appreciate all your honest advice/opinions.
- The floor looks crap now, it is a porcelain slate-effect tile and I want to change it - any recommendations in terms of colour and patterns (eg 3/4 bond, lay them straight, square tiles etc)
- The worktop and window sills are a bit bleak, they are black quartz, do you think if I got the floor re-done it would look better? (there is a sample tile on the floor under the sink that I am considering) Or do you think I should change the worktop sill? What are your opinions on these?
- I want to move the sink over to the right an inch or 2 so worktop will probably need replacement anyway
Basically what would you guys if this was your bathroom in terms of making the floor and worktops 'work'?