hey all, don't know if im in right place but here goes. ive been asked to finish off 3 bathrooms 2 of which are wetrooms. all need ripping out and starting again.everying about the work done so far is wrong..... just need u lot to point everything out so customer doest think im pulling wool over their eyes...... large format tiles dot and dabbed with tub addy, no tanking on plasterboard walls, setting out.....list goes on. just look at photos