Day work meterage

Paul - this is a forum - everyone can and should be able to express an opinion, dignified or not.
You will never agree with everyone and you should take whatever information you want and a pinch of the preverbial with the rest.
You are not a professional tiler and as such you would receive the courtesy and help to achieve a standard of finish that you would be happy with.
However a professional tiler asking if 5 sq mts a day is acceptable will allow a difference of opinions as so noted.
Even as an apprentice I wasn't given any respect from any trade until a standard or quantity off work was achieved and I'd never 'practice' on any job as a professional.
 
Paul - this is a forum - everyone can and should be able to express an opinion, dignified or not.
You will never agree with everyone and you should take whatever information you want and a pinch of the preverbial with the rest.
You are not a professional tiler and as such you would receive the courtesy and help to achieve a standard of finish that you would be happy with.
However a professional tiler asking if 5 sq mts a day is acceptable will allow a difference of opinions as so noted.
Even as an apprentice I wasn't given any respect from any trade until a standard or quantity off work was achieved and I'd never 'practice' on any job as a professional.
abemus pope 😉 ahah
 
Paul - this is a forum - everyone can and should be able to express an opinion, dignified or not.
You will never agree with everyone and you should take whatever information you want and a pinch of the preverbial with the rest.
You are not a professional tiler and as such you would receive the courtesy and help to achieve a standard of finish that you would be happy with.
However a professional tiler asking if 5 sq mts a day is acceptable will allow a difference of opinions as so noted.
Even as an apprentice I wasn't given any respect from any trade until a standard or quantity off work was achieved and I'd never 'practice' on any job as a professional.

Your right, I'm not a pro. But again, surely it depends on the job? straightforward or not straight forward? big tiles or small tiles?

We had a local guy, 75 at the time. the only reason he stopped working, he died of a heart attack (at 77). We put him in the direction of a kitchen round the corner from him (can't remember the exact meterage but it was a galley of only around 8-10 sqm in 60x30's, brick bond). He was on it for the week. The old tiles were already lifted and old adhesive gone, but still needed levelling. What he charged, I don't know. But that same customer asked him to stay to do the bathroom, lounge/diner hallway because his work was so good. after clearing his almost full diary about 3 months later, he went back to their house for about 6 weeks in total but couldn't have been any more 80-90 metres in total. 2.5 to 3 metres per day........ this time round it did include all the prep apart from the bathroom which was gutted for him.

Point is, his diary was full and he was having to turn work down. Slow? Yes, but he was well respected and he was wanted because of his workmanship.

No lets take a look at the next tiler. We had another guy local to us that sometimes did some display work. We had a new trade counter just opened and asked him if he could do a night shift to get the floor down. 50sqm. He had it levelled, tiled and grouted in 8 hours. After he went, we ripped it up before anyone saw it.
 
sufficient now ...., by the boys, finish this talk Bar.
I believe that here, we are all mature, we all know how many square meters you can do.
and all variables that there are, in a work place.
cazzo!!!, do laugh the chickens ....
@Kevbos , you have nothing more to ask for in a trend???? 😉
 
This threads gone way off track...
I've employed many a subcontract tiler when i was running the building sites and never have I paid them day work, they would spend all day drinking coffee and scratching there balls, always had them on a price per m2....
If your doing private work then who cares how many meters you do a day, not many customers would pay a day rate anyway, most want a fixed price so it's to your advantage to bang the meters out cause your make more money.
But for basic ceramics if your doing less than 5m a day then your not going to make much money or be very competitive , if your willing to take the hit cause your slow .....then no problem, long as your happy.....🙂
 
No offence MW, but if you are turning out 5m2 day in day out you want to give up and stack shelves 😉
Like has been said, probably about 2million 500 hundred of 50 bloody times
"5METRE SQUARE IS FINE NOW AND AGAIN, BUT 5M SQAURE ,DAY IN DAY OUT IS NOT ACCEPTABLE, IT IS JUST NOT ACCEPTABLE , ITS LIKE A JOINER HANGING ONE DOOR, A PLUMBER HANGING ONE RAD, A PLASTERER STICKING ON ONE BOARD, A BRICKY LAYING 3 BRICK OR A ELECTRICIAN SWEEPING UP, OK the last ain't ever gonna happen, ITS JUST NOT ACCEPTABLE 😡😡😡😡

Not acceptable for who?
 
It's not acceptable to 'widler' and it's not acceptable for most tiling companies who are paying all the overheads associated with employing a tiler. Remember we are talking prepared substrates with standard ceramic tiles for the average 5sqmts.
It may well be acceptable to a self employed tiler on £40/sq mt .
 
It's not acceptable to 'widler' and it's not acceptable for most tiling companies who are paying all the overheads associated with employing a tiler. Remember we are talking prepared substrates with standard ceramic tiles for the average 5sqmts.
It may well be acceptable to a self employed tiler on £40/sq mt .
Absolutely agree, but then again, you can price for entire job and msq no longer a question. Even the prepared surfaces questionable factor really. I mean it did happen to see OK concrete rarely, but as for walls just forget about it to find one.
 
Not acceptable for who?
For ANY employer sharon , would you be happy if you were mosaicing a straight flat 50m2 wall or floor and he/she who was working for you took ten days just for that ?
And none of this ' if he was making a good job' because thats no way to run a firm.
Like i said above , 5m2 IS acceptable now and again, but day in day out week in week out he/she would be sacked
 

Advertisement

Which tile adhesive brand did you use most this year?

  • Palace

    Votes: 9 5.2%
  • Kerakoll

    Votes: 17 9.9%
  • Ardex

    Votes: 12 7.0%
  • Mapei

    Votes: 49 28.5%
  • Ultra Tile

    Votes: 21 12.2%
  • BAL

    Votes: 40 23.3%
  • Wedi

    Votes: 4 2.3%
  • Benfer

    Votes: 5 2.9%
  • Tilemaster

    Votes: 24 14.0%
  • Weber

    Votes: 19 11.0%
  • Other (any other brand not listed)

    Votes: 17 9.9%
  • Nicobond

    Votes: 8 4.7%
  • Norcros

    Votes: 2 1.2%
  • Kelmore

    Votes: 5 2.9%