M
mellie_man
Hi
I have slowly been completing my wetroom refurb. and just about finished. Floor laid (but not grouted) and all but bottom row of walls. Before finishing I want a full belt and braces to prevent leaks. Shower marmoxed and joints tanked with Mira products. Was also going to silicon the gap between floor tiles and wall before tiling bottom row of walls and siliconing again. If this a good idea or a waste of time.
Thanks for all your help so far. Just very cautious with all the horror stories on here about tanking/tile/grout failure.:yikes:
I have slowly been completing my wetroom refurb. and just about finished. Floor laid (but not grouted) and all but bottom row of walls. Before finishing I want a full belt and braces to prevent leaks. Shower marmoxed and joints tanked with Mira products. Was also going to silicon the gap between floor tiles and wall before tiling bottom row of walls and siliconing again. If this a good idea or a waste of time.
Thanks for all your help so far. Just very cautious with all the horror stories on here about tanking/tile/grout failure.:yikes: