1
1animal1
That's what I was hoping you'd say! 🙂 the cold connection is out about 3mm too after reviewing this morning... will this be ok or does it need to be fully encased in the screed
be careful by the wires but make sure they are covered by/encased in adhesive, so don't navigate "navigate away from them to far.Will do and thanks - I was going to navigate around the wires then back butter the tiles to be safe....
If you can take them back and get some slow set .I'm more worried about the 10 minute lay time 😱