HI all, hoping for some help in terms of expansion and transition.
I am tiling around 70sqm of floor in 600x600 porcelain. Tiling throughout, various spaces (utility, Kitchen, Hall, through room). I have some questions around some transitions and edges that I am hoping for some advice on. Thanks in advance.
1. Have new sliding doors with an aluminium bottom slider. Edge of the cill is currently 20mm above floor (perfect!) and therefore I want to tile to the top of the cill. IS there any issue with tiling almost onto the cill (leaving a 2mm gap for grout) Elsewhere around the edges I am leaving a 8-10mm gap to be covered by skirting.
2. One particularly problematic transition I have is between the screed floor and existing wood hall floor. Hall floor is around 4mm higher WITHOUT any prep. I have resigned myself that I will need a transition and expansion gap. What prep would be best to reduce height jump, and has anyone got any suggestions about how to create a really professional height adjustment and expansion combined! I was going to try below, but it is a step, not expansion.!
https://www.tilersforums.com/attachments/upload_2018-4-4_20-8-9-png.97980/
Some info which might be useful in terms of what I am doing.
10mm Porcelain, on newly laid Screed floor (flat as can be!). Laitance removed, moisture down to below 1% and well below in parts and two weeks to go. Will be putting a Mapei Mapetex anti-fracture membrane down with Keraquick/PVC. Using Keraflex adhesive (the slower stuff) largely because I am not a pro and want a little more time so I don't make ****-ups. Should be fine as no-one will walk on it for at least 24 hours in the areas I tile.
I am tiling around 70sqm of floor in 600x600 porcelain. Tiling throughout, various spaces (utility, Kitchen, Hall, through room). I have some questions around some transitions and edges that I am hoping for some advice on. Thanks in advance.
1. Have new sliding doors with an aluminium bottom slider. Edge of the cill is currently 20mm above floor (perfect!) and therefore I want to tile to the top of the cill. IS there any issue with tiling almost onto the cill (leaving a 2mm gap for grout) Elsewhere around the edges I am leaving a 8-10mm gap to be covered by skirting.
2. One particularly problematic transition I have is between the screed floor and existing wood hall floor. Hall floor is around 4mm higher WITHOUT any prep. I have resigned myself that I will need a transition and expansion gap. What prep would be best to reduce height jump, and has anyone got any suggestions about how to create a really professional height adjustment and expansion combined! I was going to try below, but it is a step, not expansion.!
https://www.tilersforums.com/attachments/upload_2018-4-4_20-8-9-png.97980/
Some info which might be useful in terms of what I am doing.
10mm Porcelain, on newly laid Screed floor (flat as can be!). Laitance removed, moisture down to below 1% and well below in parts and two weeks to go. Will be putting a Mapei Mapetex anti-fracture membrane down with Keraquick/PVC. Using Keraflex adhesive (the slower stuff) largely because I am not a pro and want a little more time so I don't make ****-ups. Should be fine as no-one will walk on it for at least 24 hours in the areas I tile.