Maybe some pics of work in progress would be good... we love pics on here..
Thanks Phil. I think I'm going to plasterboard and then tank up to 2m around the whole area. Maybe still aquaboard the partition wall which the shower will sit on. My screed has not yet been laid. I currently have a drain waste in the centre of the floor which will have the gulley set into the screed. My builder says he going to level the screed with a slope from the corners to allow for the water drain. I assume I will still need to skim the remaing plaster above the 2m line and in the roof followed by a waterproof paint finish. My tiles for the wetroom are only 30x20 so should be small enough to allow for the slopes.