B
Brad
Morning all
Start a new job on mon. Tiling an outside water feature. Just have a few questions. Builder tells me the bricked wall was rendered about two weeks ago and is approx 12mm thick on average. Same applies to the horizontal/base bit. From what i have been taught i need to leave at least four weeks for the render to dry before tiling. Have told the builder this but he assures me the render is bone dry due to good weather and wants me to go ahead. Going with the builder on mon morning to buy materials. The brand will more than likely be Mapei. Any suggestions on adhesive type? Have been told to be careful when choosing adhesive so as to prevent watermarks from seeping through to the front of the tile. Also, what about sealing the render? Should i use P51? Does Mapei have an equivalent?
Tiles are 600x600x12mm. They are black granite. Have been told that they need to be sealed. Any suggestions here?
Lastly, there is a bit of external floor tiling to do next to the water feature. A slab has been laid and a 50mm screed was put down two days ago. Builder says that the he is having to hose the screed down as it is drying too quickly with the good weather. My instincts tell me not to rush this one. Any advice?
Thanks in advance for your input!
Start a new job on mon. Tiling an outside water feature. Just have a few questions. Builder tells me the bricked wall was rendered about two weeks ago and is approx 12mm thick on average. Same applies to the horizontal/base bit. From what i have been taught i need to leave at least four weeks for the render to dry before tiling. Have told the builder this but he assures me the render is bone dry due to good weather and wants me to go ahead. Going with the builder on mon morning to buy materials. The brand will more than likely be Mapei. Any suggestions on adhesive type? Have been told to be careful when choosing adhesive so as to prevent watermarks from seeping through to the front of the tile. Also, what about sealing the render? Should i use P51? Does Mapei have an equivalent?
Tiles are 600x600x12mm. They are black granite. Have been told that they need to be sealed. Any suggestions here?
Lastly, there is a bit of external floor tiling to do next to the water feature. A slab has been laid and a 50mm screed was put down two days ago. Builder says that the he is having to hose the screed down as it is drying too quickly with the good weather. My instincts tell me not to rush this one. Any advice?
Thanks in advance for your input!