First job

UK Tiling Forum; Established 2006

Welcome to the UK Tiling Forum by TilersForums.com, built in 2006 by Tilers, run by Tilers.

View all of the UK tiling forum threads, questions and discussions here.

J

joesdad

Hello everyone I've just done my first job for a member of my family,its a kitchen splash back, Ive got some pictures here for you, all constructive criticism very welcome.
Thanks Marc.


---
I am here: http://maps.google.com/maps?ll=52.556961,-1.957671
 

Attachments

  • ImageUploadedByTapatalk1327949980.877733.jpg
    ImageUploadedByTapatalk1327949980.877733.jpg
    92.5 KB · Views: 144
  • ImageUploadedByTapatalk1327950005.202087.jpg
    ImageUploadedByTapatalk1327950005.202087.jpg
    71.4 KB · Views: 138
  • ImageUploadedByTapatalk1327950061.467540.jpg
    ImageUploadedByTapatalk1327950061.467540.jpg
    79 KB · Views: 136
  • ImageUploadedByTapatalk1327950100.845685.jpg
    ImageUploadedByTapatalk1327950100.845685.jpg
    81.1 KB · Views: 133
  • ImageUploadedByTapatalk1327950124.587347.jpg
    ImageUploadedByTapatalk1327950124.587347.jpg
    68.3 KB · Views: 133
  • ImageUploadedByTapatalk1327950168.605295.jpg
    ImageUploadedByTapatalk1327950168.605295.jpg
    91.1 KB · Views: 130
  • ImageUploadedByTapatalk1327950233.679903.jpg
    ImageUploadedByTapatalk1327950233.679903.jpg
    125.3 KB · Views: 142
  • ImageUploadedByTapatalk1327950265.199331.jpg
    ImageUploadedByTapatalk1327950265.199331.jpg
    25.4 KB · Views: 139
  • ImageUploadedByTapatalk1327950290.400261.jpg
    ImageUploadedByTapatalk1327950290.400261.jpg
    120.2 KB · Views: 129
  • ImageUploadedByTapatalk1327950313.702451.jpg
    ImageUploadedByTapatalk1327950313.702451.jpg
    104.5 KB · Views: 140
  • ImageUploadedByTapatalk1327950338.381579.jpg
    ImageUploadedByTapatalk1327950338.381579.jpg
    113 KB · Views: 124
er sorry mate but to be honest i would't pay for that job, your bonds are all over the place in between the cooker hood, the bond dosn't continue in the corners, and you haven't protected the worktops......sorry just being honest..
 
you want to have all your vertical grout lines plumb m8:thumbsup:not the worst ive seen good first effort
 
The notched trowel seemed a big size for that size tile and surface protection missing, if that was a Granite work top there could've been hell to pay...
 
no lippage,looks ok,but like has been said your bond is well out,but for a 1st time its ok,everybody has to start somewhere,and who better to practice on and make mistakes than your family 😉

(erm,tubbed adhesive 🙂 )
 
Yes you have lost the bond but general quality looks ok..

Agree on the towel depth when using tubbed adhesive... and jesus get some bloody dust sheets.. 🙂🙂


Why didn;t they go up the wall unit..?
 
Not a bad effort and have seen much worse carried out by so called pro's. All valid comments above and jobs for family are a good way to practice.....


Created on iPhone.....
 
She had brought all the materials already and only wanted to go 4 tiles high and as for the dust sheets, very big mistake on my part I'm afraid and thanks for all the mistake pointers I'm taking them all on board, oh and the job was a freebie.
 
Do not be discouraged tho mate. All good points above, agree with all the guys above but for your first job you should still be happy. And good on you for having the balls to post pics of your first job and ask for criticism from a grout of the pickiest perfectionists on the web :lol:
 
it seems schoolboy errors you done there, maybe you should try get some more experience with a pro before you move onto bigger jobs or ask here, there'll be plenty of people to advise you how to get a good finish (and prep) to the job. :thumbsup:
 
Keep at it.......practice makes perfect.........just not on paid jobs though. Offer your services to a pro to gain experience. You will learn more in a day than you will find out yourself by trial & error in a month.

Good effort :thumbsup:
 
agree with the above,not bad for a first attempt but think it would defo have looked more complete tiling up to cupboards
 
A bold colour and a bold move to post it!
You need to practice putting the adhesive on the wall.
 
As already said grout lines, corners, dust sheets on work top, the socket is only half on the tiles in one pic, adhesive needs to be neater, i also noticed you started straight off the worktop with the tiles, you can run into trouble doing this as quite often worktops aren't level but i noticed there was a level in some pics so i asume you checked this before you started, looks like you started from the side wall i always start from the middle of the hood to make sure the corners are right. Doesn't look like you primed the walls first so i would read up on priming too
 
Not a bad first go at all, always room to learn no matter how good you are.
I've seen some shocking jobs from so called pros and this one isn't no where near them ! lol

Good effort and take on board what the guys have said about you bond pattern (if you have two 3rds of a tile on the right then 'wrap' the other 3rd round the corner so you only use 1 tile rather than having a full tile then next to it is a two 3rds of a tile etc...)
 
Spend some time setting the next one out too. It looks like you've found the centre of the cooker and drawn a line down there, but then started to tile randomly and neither of the vertical brick bond joints are on that centre line.

Take it all on board though and keep up the practise.
 
hi, i,d say i would leave 2mm gap between granite worktop and tile (would not stick first tile straight on worktop. But good job for first time.
 

Advertisement

Thread Information

Title
First job
Prefix
N/A
Forum
UK Tiling Forum
Start date
Last reply date
Replies
22

Advertisement

Tilers Forums Official Sponsors

Thread statistics

Created
joesdad,
Last reply from
Tony73,
Replies
22
Views
5,411

Thread statistics

Created
joesdad,
Last reply from
Tony73,
Replies
22
Views
5,411
Back