B
brian c
Tom thats the point i was trying to make m8.Not at all touchy just trying to point out that it is not possible too work out a standard rate. Some work to the principal of " i charge 25 per metre floors, 20 walls but at the end it comes down to how long the job takes. So maybe it is best to have a day rate in mind and if that person describes a 20m bathroom that you could do in 3 days then you have 3x 120 in mind but when you get there you can see it will take 4 days then a figure of 480 if accepted is a bonus.
Keep on tiling .
All the best. :joker: