Hi all,
Just about to get going on bathroom reno and would very much appreciate if you could sense check my prep, please. Plan is:
Walls
Floors
Hopefully that makes sense(?)... any tips?
Just about to get going on bathroom reno and would very much appreciate if you could sense check my prep, please. Plan is:
Walls
- Will be going back to brick > Prime with Mapei Primer G > 6mm notched bed of Larsen Pro Flexible FiberFlex for 6mm Hardiebacker, screwed with 9 x 6x60mm screws per board
- Wetroom areas will be primed with Bal APD then have Impey Membrane over. No additional prep on Hardie where there isn't Impey membrane
- All walls will then have Ardex X7G Flexible then 300x600 ceramic tiles
Floors
- Old 18mm ply removed
- 22mm P5 chipboard t&g installed > prime with Mapei Primer G > 6mm notched bed of Larsen Pro Flexible > 6mm Hardiebacker with 12 x 4x25mm screws per board
- Wetroom areas will be primed with Bal APD then have Impey Membrane over. No additional prep on hardie outside of wetroom area
- Ardex X7G Flexible for 300x600 ceramic tiles
Hopefully that makes sense(?)... any tips?