G
Gazzer
Actually seeing the customer later this week and the method i propose on top of the bare joists.
Extra noggins where seems needed
18mm wpb ply screwed down on top
The wet system panels then placed down and also screwed down onto the ply and joists
A latex based slc poured over the panels(2-3mm depth) and the pipe channels
Then finally dural ci matting.
Would that sequence appear to give us the best chance for a long tem instalation.
Cheers again
I would go with Mapei Renovation screed, cheaper than latex based . Good stuff too