B
bluetowns
If I have put floor tiles down in a small downstair toilet and I now plan to tile the walls [skirting board has been removed] then what is the procedure for the first row of tiles? Do they just sit directly on to the floor tiles or do I still have a gap at floor level and grout?Would I need to usr any sort of sealant a swell? Any replies will be much appreciated.