Long story cut short.
telephone call: "i want my conservatory tiling"
"ok when is the best time to call to measure up and qoute"
"its 14m2 how much"
"sorry but i need to see the job first, prep substrate condition tiles etc"
"its 14m2 and perfectly flat how much"
"sorry but i need to view it"
"right well im in until 2 so it will have to be before then"
"no probs i will see you at 1".
arrived and no one in :mad2::mad2: was hopping(literally:lol::lolmad and was about to go when i heard a noise in back garden so i went to the gate. builder there building conservatory walls ready for conservatory company to fit the glass.:yikes: measured up and checked levels floor was flatish but area measured 16m2. Asked builder if he knew how long floor had been down "aye" he said " i put it down last week".
phoned customer with price and told him that the area was 16m2 and not 14m2.....then explained to him about the curing time of the substrate and that it should not be tiled until at least 4 weeks after the windows and roof had been fitted or imo the job would fail.........."Rubbish" he said "you either do it next week or I will get some-one else to do it"..........at which point i put the phone down.
chris
telephone call: "i want my conservatory tiling"
"ok when is the best time to call to measure up and qoute"
"its 14m2 how much"
"sorry but i need to see the job first, prep substrate condition tiles etc"
"its 14m2 and perfectly flat how much"
"sorry but i need to view it"
"right well im in until 2 so it will have to be before then"
"no probs i will see you at 1".
arrived and no one in :mad2::mad2: was hopping(literally:lol::lolmad and was about to go when i heard a noise in back garden so i went to the gate. builder there building conservatory walls ready for conservatory company to fit the glass.:yikes: measured up and checked levels floor was flatish but area measured 16m2. Asked builder if he knew how long floor had been down "aye" he said " i put it down last week".
phoned customer with price and told him that the area was 16m2 and not 14m2.....then explained to him about the curing time of the substrate and that it should not be tiled until at least 4 weeks after the windows and roof had been fitted or imo the job would fail.........."Rubbish" he said "you either do it next week or I will get some-one else to do it"..........at which point i put the phone down.
chris