S
SlippySlipster
I asked him to sort the job out when i said it wasn't correct, he said he didn't want to.
He slapped those tiles up in about 1 hour and I have took them all off again and scrapped the adhesive off so may be able to salvage the tiles.
In no way am i in the wrong, I would pay him with no issue at all if the job was right or he sorted it out and i gave him every opportunity for him to resolve the issues.
He slapped those tiles up in about 1 hour and I have took them all off again and scrapped the adhesive off so may be able to salvage the tiles.
In no way am i in the wrong, I would pay him with no issue at all if the job was right or he sorted it out and i gave him every opportunity for him to resolve the issues.