O
Olly
Thanks for the contributions.
I appreciate that I should have set out differently before boarding the room but I didn't know what tiles or layout I was going for until after the bath was in.
The Moisture board was primed with pregrit before skimming to get a good bond.
I might try a test patch by sticking on an offcut and see what fails when I lever it back off the wall once set. If it's hard work and the paper/plaster bond doesn't fail I'll get tiling.
I appreciate that I should have set out differently before boarding the room but I didn't know what tiles or layout I was going for until after the bath was in.
The Moisture board was primed with pregrit before skimming to get a good bond.
I might try a test patch by sticking on an offcut and see what fails when I lever it back off the wall once set. If it's hard work and the paper/plaster bond doesn't fail I'll get tiling.