Amos78
We're in the middle of tiling the whole ground floor, hubby is not a pro but is capable lol well .... Because the front door entrance there was an issue with the level of the floor , to make it level we tried levelling stuff, but there was another problem with the entrance , anyway it was uneven, so he tiled in the hallway and kitchen by making the bed extra deep. Then as we were using too much adhesive he decided to use ply 6mm but we didn't know that was a big no no. I'm scared that they are gonna come up, so half the hallway and living room is done with ply underneath, obviously concrete is under that. We are doing the rest of the lounge with an extra thick bed as we are obviously too scared to carry on. He won't pull them up and start over, he won't do it He used a semi flexible adhesive and flexible grout will be used once finished. How screwed are we guys? I'm so Angry and worried