Low level access shower with heat sealed vinyl floor being laid.
Walls not prepared as normal..holes, gauges and protruding rawplugs. Planning if filling with tile cement? Initially normal PB put on main shower wet room wall, no sealant or taping or joints. Insisted be changed so now have waterproof backing boards.
Always taping gas gone over plastered ceiling and gaps left....
Help tiling prep. Tiling apparently commencing at nearest corner of window wall then working round room. Queried this as always understood start in centre of main wall (this case shower wall) then adjust either side if need be then work from there...
Walls being tiled before heat sealed vinyl floor laid.. is this normal? Know it goes up wall a little way then edging put on...howvcan walls be tiled before flooring to get line?
Walls not prepared as normal..holes, gauges and protruding rawplugs. Planning if filling with tile cement? Initially normal PB put on main shower wet room wall, no sealant or taping or joints. Insisted be changed so now have waterproof backing boards.
Always taping gas gone over plastered ceiling and gaps left....
Help tiling prep. Tiling apparently commencing at nearest corner of window wall then working round room. Queried this as always understood start in centre of main wall (this case shower wall) then adjust either side if need be then work from there...
Walls being tiled before heat sealed vinyl floor laid.. is this normal? Know it goes up wall a little way then edging put on...howvcan walls be tiled before flooring to get line?