Hi, a few years ago I used SLC in a conservatory on to the original concrete base. I primed and followed the pack instructions and info I found on here and let it set for a few weeks I think before tiling over it (I don't rush these things)
Now the tiles sound hollow in certain areas. I removed a chipped tile and realised all of the SLC is dust now. I have a couple of boxes of left over tiles.
Would I be right in thinking I should lift the rest of the tiles in the high traffic area? I'm hoping to not have to dig up the entire floor if I can salvage it. What is the best way of relaying them? without the SLC I would need approx 2cm of adhesive. Thanks for any advice.
Now the tiles sound hollow in certain areas. I removed a chipped tile and realised all of the SLC is dust now. I have a couple of boxes of left over tiles.
Would I be right in thinking I should lift the rest of the tiles in the high traffic area? I'm hoping to not have to dig up the entire floor if I can salvage it. What is the best way of relaying them? without the SLC I would need approx 2cm of adhesive. Thanks for any advice.