Hi, a few years ago I used SLC in a conservatory on to the original concrete base. I primed and followed the pack instructions and info I found on here and let it set for a few weeks I think before tiling over it (I don't rush these things)
Now the tiles sound hollow in certain areas. I removed a chipped tile and realised all of the SLC is dust now. I have a couple of boxes of left over tiles.
Would I be right in thinking I should lift the rest of the tiles in the high traffic area? I'm hoping to not have to dig up the entire floor if I can salvage it. What is the best way of relaying them? without the SLC I would need approx 2cm of adhesive. Thanks for any advice.
 

Attachments

  • floor.jpg
    floor.jpg
    229.7 KB · Views: 95
Did you leave expansion around the perimeter of the room ? . It looks like they have tented.
 
Did you leave expansion around the perimeter of the room ? . It looks like they have tented.
yes all the way around. The 2 tiles next to the hole are ones I think I should replace. That's the line of the SLC. You can't see it in the picture but the next row of tiles are ok but they would have been on the original concrete.
 
Very poor installation in the first place. An absolute disaster waiting to happen as there is not a solid-bed thick-bed adhesive bond from the tile to the floor. A dismal installation that I’m surprised has lasted this long.
 

Advertisement

Which tile adhesive brand did you use most this year?

  • Palace

    Votes: 9 5.2%
  • Kerakoll

    Votes: 17 9.9%
  • Ardex

    Votes: 12 7.0%
  • Mapei

    Votes: 49 28.5%
  • Ultra Tile

    Votes: 21 12.2%
  • BAL

    Votes: 40 23.3%
  • Wedi

    Votes: 4 2.3%
  • Benfer

    Votes: 5 2.9%
  • Tilemaster

    Votes: 24 14.0%
  • Weber

    Votes: 19 11.0%
  • Other (any other brand not listed)

    Votes: 17 9.9%
  • Nicobond

    Votes: 8 4.7%
  • Norcros

    Votes: 2 1.2%
  • Kelmore

    Votes: 5 2.9%
Back
Top