If you ask BAL technical which dispersion adhesive to use, they'll explain intermittent wetting will not affect their blue star, but regular wetting will (might be wrong on the colour, and I'm sure they don't make that even now?). So they're expecting water to get through. And they're celebrating 50 years of being a "leading brand" this year. So my email today said.
Formers are shaped to allow water to flow down to a trap.
Tanking is designed to allow water to fall into the bath.
There are umpteen products that are not just designed as a backup. They're literally designed to take the water somewhere. As the guys in the white suits know water IS getting through that cement, that's NOT going to stop it.
I appreciate you taking more time to write something decent in the thread though. And perhaps this subject is a matter for a different thread.
But water IS getting behind the tiles here. And due to the amount, I'd say its not just from use. It's from a pipe. The former and the trap are perhaps not doing their job in this case. But maybe they are and it's something else.
Goodness, we seem to have opened up a can of worms here!
It does seem that there is an awful lot of confusion about the roles played by tiles, grout, adhesive and tanking, even among professionals with many years of experience in the industry, so I'm not surprised that it is taking me so long to sort this problem out! I just thought I would try and recap where I think we have got to.....
I had sort of resigned myself to accepting that some water would always get under the tiles while showering, as I had gathered from literature/the BAL rep/forum discussions that cementitious grout is only water-resistant, not water-proof. I would imagine that porcelain tiles are pretty waterproof, so can't imagine much water would be getting through them. However, if this is the case, then why are there not more complaints on the forum of grout never drying out in tiled shower trays? It would seem that there is something different going on in our tray, which could be any of or a combination of these situations:
- more water entering behind the tiles from a leak in plumbing pipework to the shower heads
- large gaps in the grout in the tray leading to excessive ingress of water
- large gaps in the adhesive under the tiles so that water can 'pool' here, without falling down the drain
It seems unlikely that water is getting in from the drain, as this would eventually get through the membrane and on to the ceiling below, which is not happening.
What has been odd is that, having taken out the cementitious grout in the tray, and replaced it with epoxy, which is far more water-resistant, we now have dampness appearing away from the areas which get wet. WE HAVE NOT USED THE SHOWER FOR 4 WEEKS NOW AND THE GROUT OUTSIDE THE TRAY IS STILL DAMP IN PATCHES!
Thanks to all the useful discussion on this thread, it seems that this could either be because water is STILL getting through the tiling in the tray, even when the shower is not in use (from constantly leaking plumbing) OR perhaps because there is water trapped under the tiles and new epoxy grout in the tray, and this is now trying to escape through evaporation across the rest of the floor.
Having seen the results of pressure tests on the shower pipework, and never having seen any dampness on the walls (or, more likely,the ceilings below as our walls are only tanked at the bottom) I would be inclined to discount plumbing issues.
So, that leaves us with the possibility that there is still water under the tray tiles, even after 4 weeks. It could even be possible that this water dates back to the pre-epoxy days, even though we did not use the shower then for about 12 weeks, as even at this stage, we still had damp patches in the shower tray. I am told that it could take up to 6 months for dampness behind tiles to dry out! Now that we have re-grouted with epoxy, this is not helping to disperse any remaining dampness as it cannot escape easily through the epoxy, so it may be trying to escape through the adhesive bed and up through the cementitious grout on the rest of the floor.
We're sort of in limbo, as we feel that we can't do any more testing until we have a completely dry floor. Underfloor heating last week helped to dry the patches a bit, but they reappeared as soon as we switched it off, although they are diminishing slightly overall. If it gets to the stage that they are almost gone, then perhaps we should try re-using the shower, and if they return, we know that water is definitely getting in through the top of the tiling, through the epoxy.
I don't think we can do anything else at this stage.