I am doing a bathroom and lavatory refit. I will have to replace most of the floor screed in the toilet. An area of about 1m x 1.5m 25mm thick.
I will use a 4:1 mix
I expect similar problems in the bathroom and will repair screed and tile walls first leaving the bottom cut row until I can tile the floor.
How long do I need to wait before tiling the floor ?
Can I reduce the time using a fast set cement ?
I will use a 4:1 mix
I expect similar problems in the bathroom and will repair screed and tile walls first leaving the bottom cut row until I can tile the floor.
How long do I need to wait before tiling the floor ?
Can I reduce the time using a fast set cement ?