I’m trying to find clarification as to who is responsible for tiling to floors within nhbc standards on site.
We have major issues with uneven floors/screeds.
We have the groundworkers insisting they are laid tolerance, and we have our 3mm at each end of a 2m straight edge tolerance when tiling.
There is a grey are In between the two., as to who is responsible to Make the screed flat to tile to., and indeed whether tiles should be laid to level., or laid to flat.
The screeds are allowed a tolerance of 25 mm out of level over 6 m., which begs the question if we lay level to that maximum tolerance, who is responsible for extra costs involved.
This way also throws up issues at doorways if one end of the house is 25mm higher than the other.