Kent, 3.5m2 stone on chimney breast

Tilers Forums Official Sponsors

S

SandsofEss

Type of tiling work required
Domestic customer perhaps a one off
Total Meters of Tiling (either per job or week)
4m2
Area the tiling job(s) / tiling work are/is?
Near Maidstone
Afternoon all,

I'm looking for a pro tiler to fit some stone tiles to our chimney breast at our house 20 mins south of Maidstone.

  • It's around 3.5m2 of tiling in total, across the front of the breast and the returns. The stove recess doesn't need tiling.
  • The tiles are 600 x 150 and 8-18mm thick.
  • We need a heat-resistant adhesive, particularly on the two pillars, because of the stove going in the recess. I can supply this from Vitcas or Palace if required.
  • The substrate is pretty good. The chimney brickwork was very uneven, so I used heat-resistant dot & dab adhesive to stick BAL boards to the chimney, then screwed these in to the brickwork so they're not going anywhere. It's now much more level, though there are some small lips between the boards and sections where the screws sit proud by a mm or 2, which will need to be ironed out with the tile adhesive.
  • There's no need for grouting and no need for mitreing, as the external corners can be butt jointed.

Is anybody available for a day in the next couple of weeks to take this on?

Thanks a lot.
 

Attachments

  • IMG_5804 copy.jpg
    IMG_5804 copy.jpg
    55.1 KB · Views: 61
  • IMG_5806 copy.jpg
    IMG_5806 copy.jpg
    71.1 KB · Views: 52
  • Tiles.jpg
    Tiles.jpg
    52.1 KB · Views: 74
Afternoon all,

I'm looking for a pro tiler to fit some stone tiles to our chimney breast at our house 20 mins south of Maidstone.

  • It's around 3.5m2 of tiling in total, across the front of the breast and the returns. The stove recess doesn't need tiling.
  • The tiles are 600 x 150 and 8-18mm thick.
  • We need a heat-resistant adhesive, particularly on the two pillars, because of the stove going in the recess. I can supply this from Vitcas or Palace if required.
  • The substrate is pretty good. The chimney brickwork was very uneven, so I used heat-resistant dot & dab adhesive to stick BAL boards to the chimney, then screwed these in to the brickwork so they're not going anywhere. It's now much more level, though there are some small lips between the boards and sections where the screws sit proud by a mm or 2, which will need to be ironed out with the tile adhesive.
  • There's no need for grouting and no need for mitreing, as the external corners can be butt jointed.

Is anybody available for a day in the next couple of weeks to take this on?

Thanks a lot.
hi i can do this job for you, i send you my webpage so you can see how i work
View: https://www.facebook.com/221904114947995/posts/793415881130146/
 

Advertisement

Thread Information

Title
Kent, 3.5m2 stone on chimney breast
Prefix
Forum
Tiling Jobs | Find a Tiler - Post Tiling Work Here
Start date
Last reply date
Replies
2

Thread Tags

Advertisement

UK Tiling Forum

Thread statistics

Created
SandsofEss,
Last reply from
danielD,
Replies
2
Views
1,344

Thread statistics

Created
SandsofEss,
Last reply from
danielD,
Replies
2
Views
1,344

Weekly Email Digest

Back