B
bishbosh77
Hi
I was told to apply PVA glue on to floorboards before puting down the plywood (filling washing up liquid bottle with PVA) squirt over lay down ply then screw every 6 inches.
Just what i was told and it seems to work for me.
Cheers
Richard
(tiler new to the trade so you maybe sticking with the old boys for advise):joker:
I was told to apply PVA glue on to floorboards before puting down the plywood (filling washing up liquid bottle with PVA) squirt over lay down ply then screw every 6 inches.
Just what i was told and it seems to work for me.
Cheers
Richard
(tiler new to the trade so you maybe sticking with the old boys for advise):joker: